Household & Commercial Water Purifier
Filtration Media & Chemicals
Pump & Blower
Accessories
By Brand
Package Name: Construction of Surface Water Treatment Plant SWTP for supporting water supply at Coxs Bazar city and surrounding areas.
Capacity: 1000m3/h
Filtration Process: Rapid Sand Filtration System
Source of Water: Bakkhali River
Water Collection Method: Pontoon-based water intake system.
Coverage Area: Municipality area of Cox's Bazar
Construction Partner: AWCL-Green Dot Limited JV
Implemented by: Department of Public Health Engineering
Project Name: Emergency Assistance Project (EAP)
Grant No.: 0582 (Asian Development Bank)